MyLU Insider

Facilities Project Updates

Current and future projects happening around campus:

  • Mudd Library: Work to be completed July 14-18 with power disruptions
  • Campus: Annual maintenance power outage, July 14
    • Building that will not lose power:
      • 738 E Boldt Way (SLUG)
      • 741 E Boldt Way (SOL)
      • 742 E Boldt Way (Alliance)
      • 300 S Meade St (Big Exec)
      • 813 E John St (Small Exec)
      • 1025 E South River St
      • Alexander Gym
      • Buildings north of Washington St (on city power)
  • Warch: Passenger elevator replacement June 23-September 5
  • Brokaw/Colman/West Campus parking lot: Resurfaced June 30-August 1
  • Library/ Youngchild/Warch-Lawe St Bridge path: concrete replacement Summer 2025 TBD
  • Chapel Façade: Renovation to begin summer 2025 TBD
  • Quads 3-4-5, Wilson House, Big Exec: Fire system upgrades summer 2025 TBD

Watch for updates weekly; TBD dates will be filled in as learned. Please note, dates are subject to change due to weather or supply chain issues. Please be safe when in these areas!