LU Riverside Trail: paving is complete! Next up – trail lights and access gates.

Kohler Hall: work continues on the window install and basement renovation.

Music Drama: the ceilings have been removed and currently the demo of the old HVAC systems is underway.

Warch Campus Center: work has begun on the 2nd floor removing of existing flooring, which will be replaced with terrazzo.

Drew St. Pedestrian Bridge: work continues as the foundational structures are installed.

As always – safety first! Do not enter construction areas! Please be mindful of your surroundings at all times as most construction and projects are in full swing. Should you have questions or see anything concerning as you’re out and about, please contact Katherine in Facility Services at: Katherine.lehman@lawrence.edu or at ext. 6893